Repurposing a progressive cavity pump from its original use to generate electricity in turbine mode: this is the challenge PCM set for itself on behalf of one of its clients. To validate the feasibility of this approach and measure the hydraulic and mechanical performance, the manufacturer partnered with Cetim, which designed and operated a dedicated test bench capable of replicating multiphase water-air conditions.